Skip to content

Important traffic information

Arrival
Achtung Baustelle
Achtung Baustelle

Attention: In the period from 7 January to probably 7 July 2025, the Sandbach bridge at the L 75 / B 500 junction near Iffezheim will be renewed. As a result, the L 75 between this junction and Hügelsheim will be fully closed.

  • Please allow an extra 30 minutes for your journey to the airport.
  • If you are travelling to the airport from the German side via the A5 Karlsruhe / Basel or Basel / Karlsruhe motorway, please do not use the Baden-Baden exit (exit number 51) during this period. We recommend taking the diversions via the Bühl exit (exit number 52). Please follow the signs to Baden-Airpark.
  • If you are travelling to the airport from the French side, we recommend taking the diversion via the B 500 / K 3758 (road along the Rhine river on the right after the border crossing at the Iffezheim barrage) / NATO ramp near Hügelsheim. Please follow the signs to Baden-Airpark.

 

U    Deviation travaux à Hügelsheim